Gujarat International Finance Tec-City(GIFT-CITY)
Gujarat International Finance Tec-City(GIFT-CITY)
A Global Financial Hub
Shri Narendra Modi (Prime Minister of India) :
"The vision of Gujarat would be incomplete without capitalising on the in-house financial business acumen.
To tie-up with technology, to create a hub complete with infrastructure, to meet the needs of modern Gujarat, modern India and to create a space in the global financial world...that is my dream."
The Promoters :
Gujarat Urban Development Company Limited(GUDC)
Infrastructure Leasing & Financial Services Limited(IL&FS)
Gift Projects :
External Transport Connectivity :
Gujarat International Finance Tec-City (GIFT) area will be accessible from NH-8(Delhi to Mumbai).
Railway line passes by the site on the west(to Delhi) and east(to Himmatnagar).
The distance from Gandhinagar and Ahmedabad Core City are 8 kms and 12kms respectively.
Gift will be regionally connected with places,which will open doors for further development and prosperity of the city.
To achieve the transport vision & objectives,public systems such as Bus Rapid Transit System (BRTS) and Metro Rail System connecting the capital city Ahmedabad have been palled by Government of Gujarat with strong network of roads.
: Infrastructure :
Water Supply and Sewerage System :
- Water Sources:
- Narmada Main Canal
- Recycling and Reuse of Wastewater
- Rainwater Harvesting
- Proposed landscaped promenade at the river bank along GIFT
Smart GIFT(Gujarat International Finance Tec-City) :
- Integration of building infrastructure system & technology.
- Real time performance of building & systems.
- Infrastructure Management & optimization of costs.
- Upgrading quality of built up environment & ensuring occupant safety, security & comfort.
- Immediate Emergency Response for Disaster/Crisis Management
Samrudhi Sarovar & Waterfront Development :
- 1 km length and 7 m depth
- Width varying from 82 m to 160 m
- Artificially created concrete Storage Reservoir for meeting daily water demand of GIFT
- Designed for 15 days drinking water storage
- Water Body of 0.75 million m3 capacity to enhance aesthetics and for water sports activities
Solid Waste Management :
- Automated Waste Collection System(AWS) through chute system
- Minimum human intervention
- Minimises space requirement
- Waste sucked through pipes at a speed of 90 km/hr
- Waste Treatment through Plasma Technology
Power Distribution:
- Total Demand : ~ 740 MW
- Underground cabling for power distribution within GIFT
- Substation and distribution automation
- Indoor substations
- Gas Insulated Switchgear(GIS) substation for sub-transmission and distribution within GIFT city
- Compact substaion(CSS) in buildings
Utility Trench :
- All infrastructure networks (trunk) shall pass through a common utility trench
- Space optimization
- Ease in maintenance
- Safe operations
District Cooling System :
- Efficiency through economies of scale
- Reduces energy costs
- Reduces maintenance costs
- Improve air quality and temperature control
- Reduces noise and vibration
- Total Estimated Capacity : ~ 1.0 Lakh TR
0 comments
Drop Your Comments